首页

找工作

职场资讯

登录注册

招聘中

复制链接

Technician

RM1,500-2,000[月薪]

全职 · 经验不限 · 学历不限 · 霹雳-怡保
立即沟通

职位详情

职位描述

Job Requirements
Must to select the correct items exp such as parts numbers or etc.
Need to know the whole of process of filling plan system piping to control the opening or
close of valve.
If no knowledge not suitable to operate the all of valve in filling plan.
Must to know about the flow of process conveyor line working to operate the conveyor
area.
Must to know the gearbox, conveyor chain, sprocket and conveyor track.
Knowledge of safety standard in premise and obey the rule of standard safety and
procedure that produce by company.
Awareness that temperature required in the filling plan is room temperature no above 40c
(unloading process below 40c and not less 20c).
Warning: avoid contact with liquid LPG it can cause cool burn for skin.
Job Responsibilities
Selection of the right procedures to Fabricate assemble, disassemble and test.
Selection of tools to fulfil the filling plant (Hand tools, Machine and electrical tools, LPG
TOOLS WRENCH).
Assemble & test Valve and controls.
Comply with safety standards at all times.
Install bearings, sprockets, transmission gears and hydraulic valves etc.
Perform other duties as required by the supervisor.
Temperature control all equipment & machine for gas filing plant.
When to do fabrication job with welding process, grinder or drilled also do the same
process of the above.
Standby the fire extinguisher at the near location of working area when to do the test run
or fabrication job.
Make sure the emergency stop button on standby mode when to do the test run.
Double check the connection, switch, sensor or everything that connected together
before test run.
Install the items parts with correct marking position and fix the parts with screw, nuts or
connection pin.
Double check for the spec items (parts numbers or etc) before install the new equipment
or parts.
Do the correct manner, when to open the equipment's with correct open position of
equipment (first do first then last do last) and also in installation process condition do
reverse operation.
Marking the original location or position of parts or equipment that need to replace.
Check the condition items broken that need to change.
Stop any sensor or switch first if needed.
Understand three area of filling plan before operate the valve (unloading area of liquid
LPG compressor area/ storage bullet tank area/ filling plan area).
Follow the step of procedure installation to install the new valve.
Check and replace with new items if the valve is broken.
Read and comply the safety procedure with the guideline and regulation provided in the
CIMAH report.
Follow and obey the guideline or standard safety produced by the JKKP with time to time
of schedule inspection.
Obey the safety guideline for filling LPG terminals such as MYGAZ.
Close all electrical connection when need to change anything at conveyor area.
Routine check the gearbox fluid by follow the preventive checklist (six moth checklist).
Check the condition of pneumatic system at the filling machine (current supply, seal kits
or etc).
Check machine condition and machine set up to run operation.
Do the process unloading the liquid.
Repair and prevent machine broken.
Search the spare parts supplier when happen breakdown.
JKKP handling by using MYKKP account.
Outsite job (outstation project).
Monitor pressure at LPG compressor and lorry gauge (5bar to 6bar), storage bullet tank,
and filling plan (below 12bar pressure set with return valve).
IOG Sales & Marketing (M) Sdn Bhd2604200848695829

YeeUmia

工作地址

霹雳-怡保 -Tungzen Industrial Park

Static Google Map

IOG Sales & Marketing (M) Sdn Bhd

50-100人

8个热招岗位
特别申明

特别申明:

  • 熊猫招聘严禁用人单位和招聘者用户做出任何损害求职者合法权益的违法违规行为,一旦你发现此类行为,请立即向熊猫招聘投诉举报。

熊猫招聘是一家专注于马来西亚求职招聘平台,致力于连接优秀人才与优质雇主,为马来西亚的求职者和企业提供高效、便捷、智能的招聘解决方案。平台通过数字化手段,结合先进技术与深入的本地市场洞察,打造一个公平、透明的职业发展生态系统,助力个人职业成长与企业人才战略的成功。


Copyright © 2025 GATHERING DREAM GROUP SDN. BHD. 202301039979 | SSM (1533898-X)